Preliminary design workflow
- Confirm design events, allowable releases, volume and water-quality objectives, and downstream constraints.
- Screen site soils, groundwater, topography, land take, discharge point, and maintenance access.
- Develop existing- and proposed-condition inflow hydrographs for every required event.
- Build stage-storage and stage-discharge relationships for the basin and all outlet components.
- Route each hydrograph, iterate the storage/outlets, then check the auxiliary spillway and exceedance route.
- Document inspection, sediment removal, blockage response, safe access, and long-term ownership.